Pay for the work that was measured, at the rate that was agreed.
Execution carries a project from the BOQ to the contractor’s payment: work orders with locked rates, indents checked against the BOQ, purchase orders, goods received at the gate, stock issued to contractors, the measurement book and the RA bill. A bill can only be drafted from measurements the contractor has accepted.
Eight steps, from the BOQ to the contractor’s bill.
Margin is not lost in one decision. It leaks at each handover: a rate changed after the work order, material ordered beyond the BOQ, a measurement nobody checked, a deduction worked out on a calculator. The loss shows up at the end of the project, when nothing can be done about it.
The contractor agrees to the measurement on their own phone.
A dispute about quantities belongs in the week the work was measured, not the day the bill is due. Every entry goes to the contractor for a yes or a no before it can be billed.
The site engineer shares a link for one entry, or for all of a contractor’s pending entries. Copy it, or send it on WhatsApp. No app to install, no login.
The contractor sees each line, its quantity and the BOQ item it belongs to, and accepts it or disputes it with a reason. Or accepts everything at once.
Who answered, and when, is kept on the entry. Each entry can be answered once.
There is no button for your staff to accept a measurement. Only the contractor’s link can, it refuses anyone signed in as your staff, and every answer records where it came from. The link lasts 10 days by default, and you can turn it off at any time.
Deductions from the contract, not from a calculator.
The terms agreed on the work order are the terms applied on every running bill, month after month.
Made for the site, readable by the accountant.
See Execution on a walkthrough.
Execution is in early access. Talk to us about it: on a walkthrough we show you how Execution works and how it would fit your projects.
Or call +91 70106 18754, or message us on WhatsApp.