Every statutory application, and whose desk it is on.

Approvals tracks every statutory application a development needs — RERA, the planning authority, the corporation — through a status lifecycle that only moves via a recorded transition. Each one carries its checklist, its documents, its expiry and the name of the person it is currently sitting with — including an outside liaison agent, who works from a single link.

The lifecycle

Status moves one way, and only through a transition.

No screen sets a status column. Every movement goes through a service that checks the move is legal, records who made it and writes it to the timeline. That is what makes the board trustworthy six months later.

What a lapse actually costs

An expired approval is not a paperwork problem. It stops sales, stops construction, or both — and it is usually noticed in the month it matters.

TN RERA · Project registrationHolder · R. Kumar
Preparing
Raised, checklist attached
Submitted
Filed, reference recorded
Query raised
Authority asked for something
Approved
Certificate stored, expiry set
Every move is a recorded transition — who, when, from which state.
The catalogue

Your approval types, not ours.

Terra comes with a Tamil Nadu template covering the authorities below. Which ones a development needs differs by city and by project type, so the list is yours to edit — not a support ticket.

CMDA

Planning permission in the Chennai metropolitan area

DTCP

Planning permission outside CMDA limits

Local body

Building permit from the corporation, municipality or panchayat

TN RERA

Project registration

TNFRS

Fire service NOC

AAI

Height clearance near an airport

SEIAA

Environmental clearance for larger projects

TNPCB

Pollution control board consent

CMWSSB

Water and sewerage connection

TANGEDCO

Electricity supply

Completion Certificate

Before the building is occupied

Anything else

Any other approval your projects go through, added by your own team

Checklists and thresholds are guidance based on published rules, not legal advice. Your team, or your liaison agent, does the filing.

Vendors

Hand the file to your liaison agent. Keep the view.

Most approvals are prepared by someone outside the firm — a liaison agent, a fire-safety consultant, a surveyor. Assign the whole approval to them and it stays on your board the entire time.

One link for the whole checklist

Pick the vendor under Prepared by. They get a single link to every paper the approval needs — no login, no app to install. Copy it, or send it on WhatsApp.

They upload straight into it

Each paper lands on its own checklist line the moment the vendor uploads it, and the progress bar moves with it. Nothing arrives as an email attachment to be filed later.

The board shows who has it

The approval sits under With the vendor, with their name on the card, so everyone can see the next move is theirs.

Your sign-off still decides

When their papers are in, the set goes through your review chain before anything is filed. The link lasts 10 days by default (you can change that), and you can reissue or revoke it at any time.

On each approval

Enough to answer “where is it?” without a phone call.

A checklist that belongs to the type
Each approval type carries the documents it needs. Raising one creates the checklist, and a line is done the moment its document is in.
Documents attached where they are used
The filed application, the query letter, the sanctioned plan and the certificate sit on the approval, not in a shared drive named after last year.
Whose desk it is on
An approval has a holder. When the liaison person is out, the board still knows where every file is.
Signed off before it is filed
A stage can require sign-off from named roles, in order. Nothing goes to the authority until the review chain has approved the papers, and an objection comes back with a written reason.
Expiry, recorded and flagged
Validity dates are captured on approval. A certificate about to lapse shows on the board, and an email alert goes out before it does.
A timeline that survives the person
Every transition, tick, upload and edit is recorded against the approval. The history does not depend on who is still with the firm.
Watch it

Approvals, walked through.

From the board and the checklist to handing a file to a vendor, sign-off, the authority’s decision and the renewal warning.

Approvals, walked through2:36
Next step

See it against your own project.

A walkthrough runs on your data — one real approval, one live tower, last week’s enquiries. Forty minutes, no slides.

Or call +91 70106 18754, or message us on WhatsApp.